The installation capacity of wind and solar photovoltaic power is continually increasing, which makes renewable energy grid\nconnection and power generation an important link of China�s power structure optimization. A virtual power plant (VPP) is an\nimportant way to help distributed energy resource grid connection and promote renewable energy industry development. To study\nthe economic scheduling problem of various distributed energy resources and the profit distribution problem of VPP alliance, this\nstudy builds a separate operation schedulingmodel for individual VPP and a joint operation schedulingmodel for VPP alliance, as\nwell as the profit distribution model. The case study verifies the feasibility and effectiveness of the proposed model. The sensitivity\nanalysis provides information about VPP decision-making in accordance with the policy environment development trend.